My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/10/05 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/10/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:43:46 AM
Creation date
5/5/2017 10:43:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Design Scope Development. Following the workshop, the Consultant will develop a Scope of <br /> Work for detailed design. After discussion, the Scope will become the basis for a contract <br /> amendment and the detailed design to follow in Task 600. Design will include submittals for <br /> 30%, 60%, 90%, and final Construction Documents to complete Phase 2. <br /> Deliverables: <br /> • Draft Basis of Design Report, 10 copies <br /> • Agenda, workshop and meeting notes <br /> • Response to comments <br /> • Final Basis of Design Report, 10 copies <br /> Phase 2 - Design <br /> • <br /> The Consultant will complete detailed design and prepare final plans, specifications, and <br /> construction cost estimates, subject to an amendment to the Scope of Work and Fee Estimate. <br /> Interim documents will be submitted for City review at 30%, 60%, 90%, and 100%. This Phase <br /> will include field surveying and mapping, geotechnical investigations; utility agency coordination, <br /> community relations support, permit and environmental assistance, and bid assistance. <br /> Phase 3 - Construction Support Services <br /> The Consultant will provide engineering support during construction, subject to an amendment <br /> for said services. Services will include meetings, occasional site visitations, limited submittal <br /> reviews, RFI and issue review and response, preparation of record drawings, surveying <br /> (monument re-establishment); and project close-out. <br /> All Phases <br /> Task 1100 Supplemental Services or Unanticipated Tasks <br /> A management reserve is established for the City's use with unanticipated project design issues <br /> or requirements. Use of this budget is at the sole discretion of the City and will not used without <br /> separate prior written authorization from the City. The Consultant will provide a written scope of <br /> services and budget to the City for approval prior to the beginning of any requested services. <br /> END OF SCOPE OF WORK <br /> September 2011, r3.0 Page 10 of 10 Jacobs Engineering Group Inc. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.