Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 1 <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with Jacobs Proposed Action Originating Department Public Works • <br /> Engineering Group Inc.to Consent Contact Person David Voigt <br /> provide preliminary Action Phone Number . 425-257-8983 <br /> engineering services for Sewer • First Reading FOR AGENDA OF Oct. 5,2011 <br /> System Improvements"M" Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> NW Everett None Project Location Map, Legal <br /> PSA with Exhibits <br /> Amount Budgeted $8,000,000 <br /> Expenditure Required $298,700 Account Number(s):UP 3470-1 <br /> Budget Remaining $7,701,300 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Jacobs Engineering Group Inc. was selected from the current Public Works Water and Sewer Design Roster <br /> to provide professional engineering and design services to produce plans,. specifications and cost estimates <br /> for construction of the Sewer System Improvements "M"project. The Professional Services Agreement and <br /> scope of work with Jacobs Engineering Group Inc. is for a preliminary design phase only. Upon completion <br /> of the preliminary design, a contract amendment with scope and budget will be prepared for preparation of <br /> plans, specifications and construction support services. Preliminary design will occur during late 2011 and <br /> early 2012, detailed design during 2012 and construction during 2013. <br /> The primary objective of the Sewer System Improvements "M" project is to address a basement flooding <br /> problem in the vicinity of Colby, Hoyt and 15th St. This project will implement the recommendations <br /> presented in the "North Everett Combined Sewer Evaluation (Basin D) — Post June 9, 2010 Flood Event", <br /> March 2011, Otak, Inc.that recommends improvements consisting of a combination of sewer flow re-routing <br /> and separation of storm drainage from the collection sewers. <br /> In addition, this project will replace existing sewer mains, manholes, storm drain structures and side sewers, <br /> many of which are over 100 years old. Approximately 12,100 linear feet of old combined sewer main and <br /> approximately 500 side sewers would be replaced by this project. <br /> RECOMMENDATION(Exact action requested of Council):. <br /> Authorize the Mayor to sign the Professional Services Agreement with Jacobs Engineering Group Inc. to <br /> provide preliminary engineering services for the Sewer System Improvements "M" in an amount not to <br /> exceed$298,700. <br /> 1 <br />