My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/10/12 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/10/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:57:50 AM
Creation date
5/5/2017 10:57:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> • Alternative Analysis, Draft Technical Memorandum, 10 copies <br /> Task 300— CS Condition Assessment <br /> The purpose of this task is to complete condition assessment of CCTV inspection of <br /> approximately 12,120 LF of existing gravity combined sewer pipelines in the project area and to <br /> determine side sewer connection points. The focus for sewers between 10 to 80 years in age <br /> will entail both condition assessment and side sewer connections. For older sewers, the <br /> primary focus will be on side sewer locations. Newer sewers will not be included in this effort. <br /> The outcome of this task will include recommendations for CS system rehabilitation, repair, <br /> and/or replacement. <br /> Assumptions: <br /> • The City will perform CCTV inspection with City crews and will provide Consultant with <br /> CCTV inspection video, files, PACP reports and other data collected during the <br /> inspection effort. <br /> • For the purpose of this Scope of Work, it is assumed that the field CCTV field inspection <br /> effort will have a duration of approximately 1 month and the City's field crew will provide <br /> results in approximately 3 batches of information over that time. <br /> • The City will identify and handle imminent problems identified by their CCTV inspections <br /> —no consultant involvement necessary. <br /> Activities: <br /> CS Inspection. The City and Consultant will hold a pre-inspection meeting to coordinate <br /> requirements with the Consultant and the CCTV crew. The Consultant will participate in the <br /> initial field inspection work (2 days) in order to coordinate with the City's CCTV operator with <br /> respect to inspection objectives and assessment methods. It will be important to identify <br /> locations of side sewers; identify significant defects; evaluate mainline grade and alignment; and <br /> assess side sewer connection point to main line. <br /> CS Condition Assessment.The Consultant will review all CCTV digital data, rating conditions <br /> of pipes up to 80 years in age using a qualitative rating system of the Consultants' choosing, but <br /> similar to spreadsheets prepared by the City on previous projects. Sewers older than 80 years <br /> are intended to be replaced, and only require observation of side sewer locations. A Technical <br /> Memorandum will be prepared to include the Consultant's condition assessment. The <br /> Consultant will present findings and recommendations for CS repair/replacement in one 4-hour <br /> workshop. The outcome of the workshop is anticipated to be a list of CS system sections to be <br /> repaired or replaced. <br /> Deliverables: <br /> • CS system Condition Assessment spreadsheet summarizing condition. <br /> • CCTV video snapshots of serious defects in any particular run (limited to 10 per run). <br /> • Recommendations for repair and/or replacement. <br /> September 2011,r3.0 Page 7 of 10 Jacobs Engineering Group Inc. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.