My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/10/19 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/10/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 11:18:25 AM
Creation date
5/5/2017 11:18:02 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> 1. <br /> AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN <br /> THE CITY OF EVERETT <br /> AND <br /> PERTEET,INC. <br /> The City and Perteet Inc. agree to amend and modify their professional services agreement dated <br /> September 16, 2009 (the"Agreement") as follows: <br /> WHEREAS, Perteet Inc. and the City entered into an Agreement dated September 16, 2009 to provide <br /> engineering services for the General Engineering and Consulting(GEC)Management, Rucker&Hoyt <br /> Avenue Streetscape Improvements, and <br /> NOW THEREFORE, the City of Everett and Perteet Inc. agree to amend and modify the Agreement as <br /> follows: <br /> • 1., Paragraph 4.c "Compensation" shall remain the same with the changes as noted below on Tasks <br /> Five and Eight: <br /> C. Total compensation,including all services of the Contractor and its subcontractors, <br /> subconsultants, and agents and their expenses, shall not exceed a maximum of One Million, <br /> Three Hundred Six Thousand Dollars ($1,306,000). The rates for such services are <br /> attached as Exhibit A. The fees anticipated for Work on the following City Tasks are as <br /> follows: <br /> -- <br /> N:;'_a::.`w,fir'':.'• ''a'f::�x':7-^=-:'L_<cr•2..>_..r!�"`K.`.' . - <br /> iAskati' tirs'+::•.ai(.:.:.Zr341-:a.44 <br /> 2 <br /> eet. C.. ";r.. Yr+ ,n <br /> .. . . . . .f.`:'.'. <br /> Task One: GEC Management $ 63,000 <br /> Task Two: Preliminary Roadway Design $ 130,000 <br /> Task Three: Preliminary Utility Design $ 72,500 <br /> Task Four: Public Involvement/Urban Design $ .139,000 <br /> Task Five: Level One Site Assessment $ 25,000 $ 17,000 <br /> Task Six: Final Roadway Design $ 499,000 <br /> Task Seven: Final Utility Design $ 102,500 <br /> Task Eight: Other $ 129,000 $137,000 <br /> Task Nine: Construction Support $ 146,000 <br /> Contract Maximum $1,306,000 <br /> All terms, conditions and provisions of the Agreement remain in full force and effect except as <br /> expressly modified by this Amendment. <br /> • <br /> 50 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.