My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/08/12 Council Minutes
>
Council Minutes
>
2015/08/12 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:29:59 PM
Creation date
8/20/2015 1:24:07 PM
Metadata
Fields
Template:
Council Minutes
Date
8/12/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 12, 2015 <br />AGREEMENT — DESIGN SERVICES FOR NORTHWEST <br />STORMWATER SEPARATION PROJECT <br />Moved by Council Member Roberts, seconded by Council Member <br />Tuohy, to authorize The Mayor to sign the Professional Services <br />Agreement with Murray, Smith & Associates, Inc. to provide <br />preliminary design services for the Northwest Stormwater Separation <br />Project In an amount not to exceed $403,101.00. <br />Roll was called with all council members voting yes, except Council <br />Member Moore who was excused. <br />Motion carried. <br />AGREEMENT — STREET LIGHTING UPGRADES <br />Moved by Council Member Tuohy, seconded by Council Member <br />Stonecipher, to authorize the Mayor to sign the work authorization <br />with PUD No. 1 of Snohomish County for street lighting upgrades. <br />Roll was called with all council members voting yes, except Council <br />Member Moore who was excused. <br />Motion carried. <br />AGREEMENT — INSTALLATION OF ADAPTIVE TRAFFIC SIGNAL <br />CONTROL SYSTEM <br />Moved by Council Member Stonecipher, seconded by Council <br />Member Roberts, to authorize the Mayor to sign the Interlocal <br />Agreement with Snohomish County concerning the installation of <br />adaptive traffic signal control system. <br />244 <br />
The URL can be used to link to this page
Your browser does not support the video tag.