Laserfiche WebLink
Exhibit B to the Professional Services Agreement <br /> between The City of Everett and The Blueline Group,LLC for the 7 <br /> Water"L° Improvements- Hewitt Ave(WO#UP3462) <br /> dated October 28,2011 <br /> FEE SCHEDULE <br /> Consultant agrees to provide the City with the services outlined in Exhibit A for not more than the <br /> following cost without prior written approval by the City: <br /> $140,400 <br /> A fee breakdown is included in the attached spreadsheet. <br /> KEY PERSONNEL <br /> The following are the Key Personnel that will be involved in the project from The Blueline Group, LLC <br /> and their subconsultants. Estimated level of effort is included in the attached spreadsheet. <br /> The Blueline Group, ("Blueline) <br /> 25 Central Way, Suite 400 <br /> Kirkland, WA 98033 <br /> Ken Lauzen, Principal-8z Project Manager Geoff Tamble, Principal <br /> klauzen@thebluelinegroup.com gtamble@thebluelinegroup.com <br /> 425.216.4051 x231 425.216.4051 x 225 <br /> Deanna Martin, Project Engineer Adam Kay, Engineering Designer <br /> dmartin@thebluelinegrouo.com akay@thebluelinegroup.com <br /> 425.216.4051 x239 425.216.4051 x238 <br /> Axis Survey& Mapping("Axis") Associated Earth Sciences, Inc. ("AESI") <br /> 13005 NE 126th PI 2911 Hewitt Ave <br /> Kirkland, WA 98034 Everett,WA 98201 <br /> Mitch Evans, PLS Matt Miller, PE <br /> mitch@axismap.com mmiller@aesgeo.com <br /> 425.823.5700 x301 425.827.7701 <br /> 4$- <br />