My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1799-91
>
Ordinances
>
Ordinance 1799-91
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 11:29:57 AM
Creation date
5/9/2017 11:29:56 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1799-91
Date
7/3/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. „OP, <br /> r' <br /> EVERETT <br /> Al <br /> ORDINANCE NO. 1799-91 <br /> AN ORDINANCE amending Sections 3 and 4 of Ordinance No. 1482-88 <br /> and adding Section 5 to increase the total estimated cost a7a- <br /> appropriation for the special construction fund entitled <br /> "Kasch Park Construction" Fund 316, Authorizing the design <br /> and construction of improvements at Kasch Park. <br /> WHEREAS, Ordinance No. 1482-88 was created to fund the construction at Kasch <br /> Park following the tax increase approved by City Council; and <br /> WHEREAS, Ordinance No. 1482-88 included funding for construction and other <br /> miscellaneous charges need to be included; and <br /> WHEREAS, the project contractor, Blaze Construction built facilities for Kasch <br /> Park as outlined in the construction plans and specifications; and <br /> WHEREAS, based upon many necessary changes to the plans and drawings and <br /> improvements to the project, there is a need to adjust the total estimated <br /> cost and appropriation; <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> That Section 3 of Ordinance No. 1482-88 which reads as follows: <br /> The total estimated cost of the improvements authorized is $3,484,572 <br /> which shall include all costs related to design, construction, contract <br /> administration, plan development and associated costs. <br /> be and the same is hereby amended to read as follows: • <br /> The total estimated cost of the improvements authorized is $3,624,572 <br /> which shall include all costs related to design, construction, contract <br /> administration, plan development and associated costs. <br /> Section 2: <br /> That Section 4 of Ordinance No. 1482-88 which reads as follows: <br /> A. The sum of $3,484,572 is hereby appropriated to Fund 316 Program 945 <br /> "Kasch Park Construction". <br /> B. Source of Funds: <br /> 1. CIP Revenue <br /> be and the same is hereby amended to read as follows: <br /> A. The sum of $3,624,572 is hereby appropriated to Fund 316 Program 945 <br /> "Kasch Park Construction". <br /> B. Source of Funds: <br /> 1. CIP Revenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.