My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/08/19 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/08/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 9:52:33 AM
Creation date
8/27/2015 10:09:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/19/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X <br />2. Coordination with Third Parties. The Joint Use Agreement and the Third Party Agreements <br />have been structured to enable the City to assume control of the Joint Use Facilities, as provided herein and <br />in accordance with the parties' original intent as described in Recital D, in an expeditious and efficient <br />manier with very limited costs and requirements for consents and approvals from third parties. K -C and the <br />City agree to coordinate all dealings with third parties in connection with the transfer of control to minimize <br />disruption to the continued ownership and use of the Joint Use Facilities and minimize additional costs to <br />K -C and the City. Without limitation, K -C and the City shall do the following: <br />A. Marysville. The City and K -C will jointly coordinate with Marysville with respect <br />to the City's exercise of its right to assume control of the Joint Use Facilities and the City's assumption of <br />K -C's rights and obligations under the K -C Marysville Agreement, as was anticipated in Section 5.3 of the <br />City Marysville Capacity Agreement and Section 5.4 of the K -C Marysville Capacity Agreement. <br />B. Port of Everett. The City and K -C will jointly inform the Port of Everett that K -C <br />has conveyed the Joint Use Facilities to the City and that the City will assume K -C's rights and obligations <br />under the Tri -Party Agreement, as was anticipated in Section 11.E of the Port Easement. <br />C. Department of Natural Resources. K -C will cooperate with the City regarding the <br />City's assumption of control of the Joint Use Facilities and the transfer of the K -C Capacity to the City. <br />D. BNSF. K -C and the City will use commercially reasonable efforts to obtain BNSF's <br />consent to the assignment of the BNSF License to the City pursuant to Section 30 thereof. <br />3. Operations and Maintenance Costs. K -C shall have no further obligation to reimburse the <br />City for any operation or maintenance costs for the Joint Use Facility arising after the Transfer Effective <br />Date. The City shall pay K -C $71,687.01 within 30 days after receipt of an invoice from K -C for such <br />amount, which the City and K -C agree is full payment for all outstanding amounts due to K -C related to the <br />sediment sampling in 2013 and the beach repair work as originally outlined in the memorandum dated July <br />19, 2012 from Anchor QEA, LLC to K -C and the City. Upon receipt of such payment, K -C and City agree <br />that they have paid each other in full for all operation and maintenance costs arising prior to the Transfer <br />Effective Date. <br />4. Transfer Effective Date. The "Transfer Effective Date" for the purposes of this <br />Amendment shall be the first business day after the full execution of this Amendment by the parties hereto. <br />5. Satisfactory Performance of Prior Construction Obliizations. K -C and the City agree that <br />(i) K -C has designed and constructed the Joint Use Facilities and the Facilities have been finally accepted <br />and placed in service all in accordance Sections 10.4 and 11 and the other provisions of the Joint Use <br />Agreement and (ii) the City has paid, in frill, all amounts payable by the City under Sections 4 and 5 of the <br />Joint Use Agreement. To the extent it has not already done so, K -C hereby assigns as of the Transfer <br />Effective Date to the City all warranties, rights and claims against any engineering firms, designers, <br />architects, suppliers, environnental and other consultants, Construction Contractors and other third parties <br />relating to the design, engineering, construction and operation of the Joint Use Facilities. The provisions of <br />Section 11.3.2 of the Joint Use Agreement shall remain in full force and effect after the Transfer Effective <br />Date. <br />6. Project Review Team. As of the Transfer Effective Date, K -C shall not have the right to <br />participate on the PRT or have any representatives on the PRT and actions by the PRT after such date shall <br />not be subject to the agreement of K -C. The City shall have the sole right to select the representatives on the <br />PRT, set the agenda for the PRT and, in its discretion, terminate the PRT and select a different method or <br />body to provide policy and management coordination and oversight of the Joint Use Facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.