My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/03/21 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/03/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 9:12:42 AM
Creation date
5/10/2017 9:10:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: <br /> Reject all bids for the Briefing COUNCIL BILL# <br /> SR99/Evergreen Way BRT Proposed Action Originating Department Public Works <br /> Signal Priority Improvements Consent Contact Person Ryan Sass,P.E. <br /> (Rucker and Pacific)and Action Phone Number 425-257-8942 <br /> authorize a new call for bids First Reading FOR AGENDA OF March 21, 2012 <br /> for the SR99/Evergreen Way Second Reading <br /> BRT Signal Priority Third Reading <br /> Improvements (Rucker and Public Hearing <br /> Pacific) Budget Advisory Initialed by: <br /> Department Head <br /> CAA �,� — <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Rucker Ave. and Pacific 1/18/2012 Council <br /> Ave. authorized call for bids <br /> 2/28/2012 Bids opened <br /> Amount Budgeted $ 1,230,000.00 <br /> Expenditure Required -0- Account Number(s): PW3360 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Bids were opened on February 28, 2012,with six (6)bid proposals received for the construction project. The <br /> City bid document included an incorrect DBE bid form and has been advised by the Washington Department <br /> of Transportation that it cannot award the bid under federal guidelines. Consequently,Public Works is <br /> recommending that all bids be rejected and authorization for another call for bids be approved for this <br /> project. This project will replace traffic signal controllers, controller cabinets, and install conduit systems <br /> and fiber optic communications cable through the Rucker Avenue and Pacific Avenue corridor to facilitate <br /> and implement the Transit Signal Priority System. <br /> The budget for the construction contract is$ 1,098,941.50 and the sources of funds are: <br /> CM-0099(104)—Federal Grant $ 969,400.00 <br /> Fund 157—Traffic Mitigation 130,300.00 <br /> Fund 425—Everett Transit 130,300.00 <br /> Total sources of funds $ 1,230,000.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Reject all bids for the SR99/Evergreen Way BRT Signal Priority Improvements (Rucker and Pacific) and <br /> authorize a new call for bids for the SR99/Evergreen Way BRT Signal Priority Improvements (Rucker and <br /> Pacific). <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.