Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with GeoEngineers Proposed Action Originating Department Public Works <br /> for Engineering Services for Consent Contact Person Grant Moen <br /> Powder Mill Gulch Tributary Action Phone Number (425)257-8947 <br /> Stream Stabilization Design First Reading FOR AGENDA OF March 21,2012 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA 1 <br /> Council President <br /> Wpm_ <br /> Location Preceding Action Attachments Department(s)Approval <br /> Amount Budgeted -0- <br /> Expenditure Required $165,001.00 Account Number(s):UP3508-1 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> • <br /> DETAILED SUMMARY STATEMENT: <br /> A tributary to Powder Mill Gulch flows through a 25-foot wide arch culvert under 25th Avenue West between <br /> 56th Street Southwest and 57th Street Southwest. Significant erosion has occurred in the stream channel <br /> recently. Due to this erosion, City crews have conducted several small scale stabilization projects over the <br /> last year and a half. GeoEngineers Inc.provided design recommendations and engineering services for these <br /> small scale projects. <br /> Under this contract,GeoEngineers Inc.will provide engineering services and design a long term stabilization <br /> project for the portion of the tributary stream channel between the 25th Avenue West culvert and <br /> approximately 1,000 feet downstream of the culvert. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with GeoEngineers Inc.for the Powder <br /> Mill Gulch Tributary Stream Stabilization Design in the amount of$165,001.00. <br /> 17 <br />