My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ l <br /> ° REQUEST FOR PROPOSALS <br /> General Contractor/Construction Manager Services for <br /> • <br /> Water Pollution Control Facility Expansion-Phase C <br /> c. Electrical and instrumentation work will include <br /> improvements to support the new and modified facilities. <br /> D. Project.Cost and Schedule: <br /> 1. The estimated MACC for Phase Cl is $20:0 million, and Phase C2 is <br /> $30.0 million, which do not include Percent Fee, Specified General <br /> Conditions costs, or sales tax. <br /> 2. Construction on Phase Cl of the Project is scheduled to begin in <br /> January 2014. Construction of Phase Cl must be substantially <br /> complete by December 2015. Construction of Phase C2 must be <br /> substantially complete in December 2017. <br /> E. Additional Project Information <br /> For further information on the Water Pollution Control Facility, Attachment C <br /> includes Volumes 1 & 2 of the 30% Design Submittal.. <br /> 3.0 SCHEDULE <br /> The following is the current schedule for the selection, contracting, and construction for <br /> the Project. The City reserves the right to modify the schedule as circumstances may <br /> warrant. Dates may be different in the Request for Final Proposals (RFFP). <br /> Date Description <br /> April 16, 2012 Issuance of RFP by City Purchasing Department <br /> First date of advertisement of the RFP in the Seattle <br /> April 16, 2012 Daily Journal of Commerce and the Everett Herald <br /> Second date of advertisement of the RFP in the <br /> Seattle Daily Journal of Commerce and the Everett <br /> April 23, 2012 Herald <br /> Pre-Proposal Meeting at 10:00 AM Pacific Time at <br /> the following location: 3200 Cedar Street, Everett, <br /> May 1, 2012 WA 98201 <br /> Proposal Submission Deadline no later than 2:00 <br /> PM Pacific Time, according to the clock of the City <br /> May 11, 2012 Clerk <br /> May 23, 2012 Proposal Review Complete <br /> City of Everett Page 8 April 16, 2012 <br /> Water Pollution Control Facility Expansion-Phase C1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.