My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Request for Proposals for the Briefing COUNCIL BILL# <br /> selection of a General Proposed Action Originating Department Public Works <br /> Contractor/Construction Consent Contact Person John Nottingham <br /> Manager(GC/CM) for the Action Phone Number 425-257-8872 <br /> design review and construction First Reading FOR AGENDA OF April 4, 2012 <br /> of the Water Pollution Control Second Reading <br /> Facility Phase C Expansion Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA CLIj <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> WPCF on Smith Island Use of GC/CM 3/31/10 GC/CM Request for Legal <br /> Proposals (RFP) <br /> Amount Budgeted $70 million Construction cost estimate <br /> Expenditure Required $2000.00 Account Number(s): UP 3412 <br /> Budget Remaining $70 million <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Council authorized use of General Contractor/Construction Manager(GC/CM) alternative delivery <br /> procedures for the Water Pollution Control Facility(WPCF)Phase C expansion project in March 2010. The <br /> project meets the criteria established in RCW 39.10.340 for use of the GC/CM procedure. This project, for <br /> which the RFP is ready to be published, is needed to expand the capacity of the City's WPCF which has <br /> nearly reached its capacity. The total project is estimated to cost about$77 million, $70 million of which is <br /> the construction-related cost. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the advertisement of a Request for Proposals for the selection of a General <br /> Contractor/Construction Manager(GC/CM)for the design review and construction of the Water Pollution <br /> Control Facility Phase C Expansion. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.