Laserfiche WebLink
Evergreen Way Revitalization Plan 2 <br /> Engineering, discussed other transportation options, while Planning Department staff <br /> noted a variety of land use issues. The planning team summarized the detailed input <br /> from the walk-about sessions and developed land use and capital improvement concept <br /> maps. <br /> Economic Outlook. Greg Easton, of Property Counselors, with staff input, identified <br /> potential redevelopment sites for the economic feasibility analysis, and produced a <br /> report evaluating the economic feasibility of redevelopment of specific parcels (See <br /> Appendix 3). From this work, it became apparent that avariety of capital improvements, <br /> development incentives, and code changes are necessary to create an environment <br /> more conducive to private investment and redevelopment. <br /> Expanded Study Area. After beginning work on the Evergreen Way Revitalization <br /> Plan, the City received a federal grant to expand the study area to include the <br /> unincorporated portion of Highway 99 between Everett and Lynnwood. Planning for the <br /> expanded area incorporated input from City of Mukilteo and Snohomish County <br /> representatives to discuss possibilities for the Swift BRT station areas between Airport <br /> Road and 148th Street SW. The County and Mukiiteo emphasized the importance of <br /> creating midblock pedestrian connections, regional transit connections, and better <br /> linkages to local resources. The group showed strong interest in exploring phasing <br /> strategies, options for horizontal mixed-use over time, and the potential for Gibson Road <br /> as another BRT node. High-intensity mixed-use zones in the County BRT nodes were <br /> also Supported. <br /> The planning team solicited public feedback on the redevelopment concepts, capital <br /> improvement proposals, proposed zoning standards, the economic effects of raised <br /> height limits, zoning requirements-versus-incentives issues, and the distinction between <br /> landscaping standards for BRT node areas and other corridor segments. The public's <br /> responses to these subjects helped the planning team refine the various plan elements <br /> and zoning code details. <br /> • <br /> Description of Existing Conditions <br /> Physical Conditions <br /> Existing Land Use. The existing development pattern along Evergreen Way is <br /> primarily auto-oriented businesses with surface parking lots fronting the highway. The <br /> study area contains a mix of commercial, residential, industrial, hotel, and storage uses. <br /> Development is sometimes in a strip mall form, yet stand-alone businesses and big <br /> boxes are also common. Major commercial centers and businesses include Staples, <br /> Rite Aid, QFC, Value Village, automobile dealerships, Walgreens, shopping centers, <br /> Fred Meyer,K-Mart, Albertson's, Office Depot, Walrnart, Home Depot, and two <br /> Safeways. There is a wide range of smaller businesses, as well. Automobile and <br /> recreational vehicle (RV) sales, rental, repair, and services are prevalent in the corridor. <br />