My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/11 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:30:02 AM
Creation date
5/10/2017 10:28:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Evergreen Way Revitalization Plan <br /> 2 must be noted that added annual maintenance costs borne by the City will increase in order <br /> to properly maintain median landscaping in a healthy and attractive condition. This plan <br /> does not identify additional funds necessary for increased maintenance obligations. As with <br /> any capital project the City undertakes, it must also consider the ongoing costs of <br /> maintenance, particularly in a challenging work environment (lane closure, flaggers, etc.) <br /> like Evergreen Way where traffic volumes are significant and worker safety is the primary <br /> concern. <br /> "Median Landscape,"to enhance the aesthetics of the corridor. <br /> EXISTING <br /> CI ie. <br /> ■ I u I1 II !t <br /> / 1Sidawalk/ The GP lane I Thru GP lane 1 The GP lana I Center lum lane 1 I Thru GP lane Thru OP lane I The GP lane ,Sidzwalk1 ! <br /> 2.5' 6.5 13' 11' 11' I 12' 11' 11' 13' 6.5' 2.5' <br /> 82'1 <br /> ! 00' / <br /> PROPOSED <br /> Center Turn Lane <br /> f 's <br /> r' ri: <br /> LL J` <br /> Sidewalk '4118 The GP lane The GP lane ,The GP lane I Center tum lane ,The GP lane The GP lane The GP lane /lnig/Sidewalk/ <br /> 8' 4' 13' I 11' 11' 1 12' 11' 11' 13' 4' 8' <br /> / / <br /> 82' <br /> / i 105' / <br /> PROPOSED <br /> Median Landscape <br /> f' <br /> )Sr= rJ f <br /> -c ,.,) <br /> ;i,l,c..11 <br /> T <br /> 1� .,rte 1 l—_-,,, 1 ::-, 66:4 <br /> : Vit,.},,, .,4f"i -- 't e Ct. <br /> - i w <br /> • J,Sidewalk Iylnlo, The GP lane 1 The GP lane 1 The GP lane�Medianl m lane Thru GP lane 1 The GP lane I The GP lane ,,Plnlgt Sidewalk! <br /> 8' 4'/ 13' 11' 11' 12' 11' 11' 13' 4' B' <br /> ! 82' <br /> 105 <br /> Figure 11 <br /> The following graphic (Figure 12) identifies redevelopment strategies and some <br /> conceptual capital improvements within and near the Evergreen Way corridor. Capital <br /> improvement projects that support the land use strategies of this plan may extend to <br /> areas far beyond the areas proposed for rezoning. More detailed review of potential <br /> capital improvements, design, costs, benefits and priorities may result in the decision to <br /> not build some of the improvements identified in this plan. Other improvements not <br /> listed in this plan may also be identified in the future as priority projects to enhance <br /> access between the Evergreen Way corridor and surrounding neighborhoods. <br /> Pe • <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.