My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/11 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:30:02 AM
Creation date
5/10/2017 10:28:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> ORDINANCE NO. <br /> An Ordinance Establishing two new Zoning <br /> Classifications,the Evergreen Way Zone and the 4 ' <br /> Mixed Use Overlay Zone,and Amending the Everett <br /> Zoning Code, Ordinance No. 1671-89, as amended <br /> (EMC Title 19). <br /> WHEREAS,the City Council finds the following: <br /> 1. The City Council initiated the Evergreen Way Revitalization Plan in 2009 to address, <br /> among other matters,improving land use and development standards,supporting Swift <br /> Bus Rapid Transit investments, accommodating economic and population growth, and <br /> implementing the policies of the Comprehensive Plan. <br /> 2. The City selected a consultant team to conduct analysis of existing conditions,identify <br /> projected needs,and propose a revitalization strategy related to economic development, <br /> land use,transportation,housing,urban design, and capital improvements. <br /> 3. The consultant team and City staff conducted substantial public outreach efforts to <br /> identify the concerns of citizens,business and property owners, and public service <br /> providers related to existing conditions and future land use, economic,transportation and <br /> capital improvement needs within the Evergreen Way corridor and surrounding <br /> neighborhoods. <br /> 4. City staff and the consultant team conducted an extensive public outreach program. <br /> 5. Public feedback from public workshops demonstrated general support for changes to land <br /> use and development standards that would support existing businesses and improve <br /> connections with surrounding neighborhoods,while encouraging quality redevelopment <br /> with more intensive commercial,residential and mixed-use development. <br /> 6. The consultant team and City staff prepared draft revisions to zoning development and <br /> design standards and identified potential rezones for properties within the Evergreen Way <br /> corridor,which were generally supported by the public. <br /> 7. The Planning Commission conducted public workshops on October 18, 2011,November <br /> 14,2011,December 6,2011, and a public hearing on February 21,2012 to take public <br /> testimony and provide direction to City staff concerning the Evergreen Way <br /> Revitalization Plan and proposed zoning standards. <br /> 1 <br /> 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.