My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/25 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 8:25:29 AM
Creation date
5/12/2017 8:24:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 7 <br /> PROJECT TITLE: <br /> Change Order#5 with Stellar J Briefing COUNCIL BILL# <br /> Corporation for the WPCF Proposed Action Originating Department Public Works <br /> Phase B-2 Improvement Consent Contact Person Tom Fuchs <br /> project Action Phone Number 425-257-8931 <br /> First Reading FOR AGENDA OF 4/25/2012 <br /> Second Reading <br /> Third Reading <br /> Public Hearing Initialed by: <br /> Budget Advisory Department Head <br /> CAA <br /> Council President timil" <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Pollution Control 2/5/11 Bid Change Order#5 Public Works <br /> Facility 3/2/11 Award <br /> 4/18/11 Change Order#1 <br /> 10/28/11 Change Order#2 <br /> 11/14/11 Change Order#3 <br /> 1/29/12 Change Order#1 <br /> Amount Budgeted $2,467,616.19 Account Number(s): UP 3358-22 <br /> Expenditure Required $2,717,616.19 Exclusive of Washington State Sales Tax <br /> Budget Remaining $0.00 <br /> Additional Required $250,000.00 <br /> DETAILED SUMMARY STATEMENT: <br /> The Water Pollution Control Facility(WPCF)Phase B-2 Improvement project includes modifications to the <br /> existing headworks structure including installation of two owner-furnished grit pumps,replacement of existing <br /> slide gates and piping,hydraulic improvements,repair and recoating of damaged concrete surfaces, <br /> miscellaneous demolition and electrical work,installation of nine internal joint seals to repair damage, slip <br /> lining(HDPE) for two 54-inch concrete pipes,hydraulic modifications to the existing final effluent pump <br /> station, and fill placement and preload construction for future digesters. <br /> Change Order#5 adds one(1)new bid item to the contract, in the amount of$250,000.Because the existing <br /> operational control gates between the second Aeration Cell and the Oxidation Pond were discovered during <br /> slip-lining operations to be severely deteriorated and beyond repair, Change Order#5 adds the installation of <br /> two (2) Stainless Steel 54-Inch ALE Sluice Gates. Change Order#5 incorporates all labor, equipment, <br /> materials, and markups to complete the installation. <br /> These gates allow level control of the Aeration Cells to provide maximum flow out of the aeration cells <br /> during storm events and prevent damage to the aeration cell dikes. <br /> This Change Order#5 also adds 108 calendar days to Schedule A. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#5 with Stellar J Corporation for the WPCF Phase B-2 <br /> Improvement project for a net increase of$250,000.00 to the total Contract price. <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.