Laserfiche WebLink
. . <br /> • <br /> Run Date: 4/24/2012 City of Everett-Public Works Department Cutoff Date: 4/18/2012 <br /> • Time: 10.41 AM Contract Estimate Voucher <br /> Project: 262 For Work Order#3398A Contractor: SHORELINE CONSTRUCTION <br /> Sewer System L Replacement and, Estimate#13 PO BOX 358 <br /> Improvements WOODINVILLE WA 98072 <br /> WO 3398A BID:$3,357,337.99 <br /> TOTAL BID:$3,357,337.99 <br /> • Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount , <br /> 0001 Mobilization LS 260,000.00 1.00 1.0000 1.0000 0.0000 260,000.00 260,000.00 0.00 <br /> 02002 Surveying LS 25,000.00 1.00 1.0000 1.0000 0.0000 25,000.00 25,000.00 0.00 <br /> W003 Traffic Control Labor HR 45.00 2,160.00 4,999.0000 4,999.0000 0.0000 224,955.00 224,955.00 0.00 <br /> 0004 Maintenance&Protection of Traffic Control LS 15,000.00 1.00 1.0000 1.0000 0.0000 15,000.00 15,000.00 0.00 <br /> 0005 Street Cleaning&Sweeping HR 100.00 240.00 169.0000 169.0000 0.0000 16,900.00 16,900.00 0.00 <br /> 0006 Sawcut,Final Joint Cut Up to 6"thickness LF 0.50 4,565.00 3,226.0000 3,226.0000 0.0000 1,613.00 1,613.00 0.00 <br /> 0007 Sawcut,Final Joint Cut Add'I 1"thickness LF 0.10 1,138.00 3,532.0000 3,532.0000 0.0000 353.20 353.20 0.00 <br /> 0008 Pothole for Utility Locaion EA 100.00 118.00 2.0000 2.0000 0.0000 200.00 200.00 0.00 <br /> 0009 Trench Excavation Safety System LS 80,000.00 1.00 1.0000 1.0000 0.0000 80,000.00 80,000.00 0.00 <br /> 0010 Temp.Sedimentation&Erosion Control LS 10,000.00 1.00 1.0000 1.0000 0.0000 10,000.00 10,000.00 0.00 <br /> 0011 Pavement Marking LS 4,000.00 1.00 1.0000 1.0000 0.0000 4,000.00 4,000.00 0.00 <br /> 0012 Roadway Excavation SY 1.00 20,900.00 20,900.0000 20,900.0000 0.0000 20,900.00 20,900.00 0.00 <br /> 0013 Construction Geotextile for Separation SY 1.00 9,600.00 1,607.7000 1,607.7000 0.0000 1,607.70 1,607.70 0.00 <br /> 0014 Crushed Surfacing Top Course TN 19.00 3,700.00 1,056.9200 1,056.9200 0.0000 20,081.48 20,081.48 0.00 <br /> 0015 Crushed Surfacing Base Course TN 19.00 7,800.00 16,444.2300 16,444.2300 0.0000 312,440.37 312,440.37 0.00 <br /> r. J16 Asphalt Treated Base(ATB) TN 40.00 4,900.00 3,041.9500 3,041.9500 0.0000 121,678.00 121,678.00 0.00 <br /> 0017 Topsoil Type A CY 50.00 80.00 588.0000 588.0000 0.0000 29,400.00 29,400.00 0.00 <br /> 0018 Temporary Pavement Patch TN 40.00 820.00 345.8600 345.8600 0.0000 13,834.40 13,834.40 0.00 <br /> 0019 HMA Class 1/2"PG 64-22 TN 74.00 4,100.00 3,069.2300 3,069.2300 0.0000 227,123.02 227,123.02 0.00 <br /> 0020 Gravel Borrow TN 0.01 32,800.00 15,318.5900 15,318.5900 0.0000 153.19 153.19 0.00 <br /> 0021 Controlled Density Fill(CDF) CY 10.00 1,200.00 0.0000 0.0000 0.0000 0.00 0.00 0,00 <br /> 0022 Foundation Material TN 0.01 9,440.00 631.0400 631.0400 0.0000 6.31 6.31 0.00 <br /> 0023 Manhole Type 1,48-Inch Dia EA 4,000.00 9.00 9.0000 9.0000 0.0000 36,000.00 36,000.00 0.00 <br /> 0024 Manhole Type 1,60-Inch Dia EA 5,000.00 9.00 9.0000 9.0000 0.0000 45,000.00 45,000.00 0.00 C <br /> 0025 Manhole Type 2,72-Inch Dia EA 5,000.00 2.00 1.0000 1.0000 0.0000 5,000.00 , 5,000.00 0.00 <br /> 0026 Manhole Type 3,72-Inch Dia EA 11,000.00 7.00 7.0000 7.0000 0.0000 77,000.00 77,000.00 0.00 <br /> 0027 Manhole Type 3,96-Inch Dia EA 40,000.00 1.00 1.0000 1.0000 0.0000 40,0.00.00 40,000.00 0.00 <br />