My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6101 ASSOCIATED BLVD BASE FILE 2017-06-05
>
Address Records
>
ASSOCIATED BLVD
>
6101
>
BASE FILE
>
6101 ASSOCIATED BLVD BASE FILE 2017-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 1:50:29 PM
Creation date
5/15/2017 10:33:04 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6101
Tenant Name
BASE FILE
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 8: PUBLIC SERVICES AND UTILITIES <br /> 8.1 FIRE <br /> 8.1.1 Threshold <br /> None <br /> 8.1.3 Mitigation Measures <br /> 1. Water main extensions will be required to serve specific sites. (See Section 8.6: Public Water Supplies) <br /> 8.2 POLICE <br /> 8.2.1 Threshold <br /> None <br /> 8.2.3 Mitigation Measures <br /> 1. All developments must provide adequate lighting of parking lots and others areas which have an increased risk <br /> for crime. Illumination should be a minimum of 3-4 foot candles. (The City of Everett Zoning Code requires <br /> that all parking lots with more than 10 spaces provide security lighting. Lighting must be shielded in a manner <br /> that does not disturb residential uses.) (SEPA Public Services and Land and Shoreline Use Policies) <br /> 8.3 SCHOOLS <br /> 8.3.1 Threshold: None <br /> 8.3.3 Mitigation Measures: None <br /> 8.4 PARKS AND RECREATION <br /> 8.4.1 Threshold <br /> None <br /> 8.4.3 Mitigation Measures <br /> 1. When a trail system plan is adopted as part of the City's Comprehensive Plan, and when development is <br /> proposed on a parcel on or adjacent to a proposed trail per the adopted pian,there must be compliance with <br /> the trail system plan. (SEPA Land and Shoreline Use and Transportation Policies) <br /> 8.5 COMMUNICATIONS <br /> 8.5.1 Threshold <br /> Most communication facilities are exempt from SEPA review. This SEPA analysis covers all aboveground <br /> communication facilities provided that view analysis is completed in the Special Property Use permit process. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.