Laserfiche WebLink
f <br /> GENERAL NOTES: <br /> Guardrail/Fence <br /> Rockery construction shall be performed in accordance � Per City Standards <br /> with the Associated Rockery Contractor Guidelines. <br /> Parking Stall <br /> Rockery construction is a craft.The skill and experience Rock Size per (250 pSt} <br /> of the builder will largely dictate the success of the <br /> construction. Geotechnical Engineer <br /> and ARC Guidelines <br /> A rockery is a protective system with respect to the <br /> weathering and erosion process on an exposed soil face. `` 2' max. <br /> t <br /> Maximum rockery height H= 9 feet. <br /> GEOGRID SOIL REINFORCEMENT // 0 2' k' <br /> Miragrid 5XT or equivalent. <br /> STRUCTURAL GEOGRID INSTALLATION s0. <br /> ..:t <br /> Geogrid shall be oriented with the highest strength <br /> ' 2' Reinforced <br /> axis perpendicular to the rockery alignment. H � •'d .- Fill <br /> Geogrid Reinforcement shall be placed at the strengths, ` b, •; <br /> lengths and elevations shown on the construction design ,'0; <br /> drawings or as directed by the Engineer. f , �o,:.�a 2 <br /> LR= —p <br /> The geogrid shall be laid horizontally on compacted <br /> backfill and extend to the back of the rockery.The <br /> geogrid shall be pulled taut,and anchored prior to ti ���'•;o <br /> backfill placement on the geogrid. <br /> j Geogrid Reinforcements shall be continuous throughout <br /> their embedment lengths and placed side-by-side to <br /> provide 100%coverage at each level.Spliced connections 12'min• o ;o <br /> between shorter pieces of geogrid or gaps between <br /> adjacent pieces of geogrids are not permitted. I 1 <br /> REINFORCED BACKFILL PLACEMENT <br /> Tracked construction equipment shall not be operated directly upon the <br /> Reinforced Backfill shall be placed,spread an compacted geogrid reinforcement.A minimum fill thickness of 6 inches is required <br /> in such a manner that minimizes the development of slack prior to operation of tracked vehicles over the geogrid.Tracked vehicle <br /> in the geogrid and installation damage. turning should be kept to a minimum to prevent tracks from displacing <br /> ' Reinforced Backfill shall be placed and compacted in lifts the fill and damaging the geogrid. <br /> not to exceed 6 inches where hand compaction is used, Rubber tired equipment may pass over geogrid reinforcement at slow <br /> or 8-10 inches where heavy compaction equipment is used. speed,less than 10 mph.Sudden braking and sharp turning shall be <br /> Lift thickness shall be decreased to achieve the required avoided. <br /> density as required. <br /> At the end of each day's operation,the Contractor shall slope the last <br /> Reinforced Backfill shall be compacted to 90%of the lift of reinforced backfill away from the rockery to direct runoff away from <br /> maximum density as determined by ASTM D-1557-02. wall face.The Contractor shall not allow surface runoff from adjacent <br /> The moisture content of the backfill material prior to and areas to enter the wall construction site. <br /> during compaction shall be at or near the optimum <br /> moisture content. FIELD QUALITY CONTROL <br /> Only lightweight hand-operated equipment shall be allowed The rockery construction shall be observed by the Geotechncial <br /> within 3 feet of the back of the rockery. Engineer on a periodic or full-time basis as appropriate.Testing of the <br /> compacted backfill shall be performed by the Geotechncial Engineer. <br /> LEGEND: '• <br /> e b_0 Drainage materials to consist of clean angular 1 t <br /> qo •�,0• well-graded quarry spalls,with 4-inch maximum <br /> size,or other material approved by the geotechnical <br /> engineer. <br /> (III Undisturbed firm Native Soil. REINFORCED ROCKERY-SURCHARGE CONDITION <br /> Underwood Gartland - Wet Ponds <br /> + Drain pipe;4-inch minimum diameter,perforated <br /> V or slotted rigid plastic PVC pipe,laid with a positive Everett, Washington <br /> gradient to discharge under control,well away from <br /> the wall. Drwn. GLS Date 04/01/2015 Proj. No. 2232.02 <br /> Checked RAC Date April 2015 Plate 2 <br />