Laserfiche WebLink
0 A 0 <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Oct 2013 <br /> Project Address Underwood Gartland - Building A Date 02/17/2015 <br /> 0 6.3% Max.Target: 30% For Building Department Use <br /> Fenestration Area as /o gross above-grade wall area 9 <br /> Skylight Area a5%gross roof area 2.0% Max.Target: 5% <br /> Vertical Fenestration Alternates: None Selected on ENV-SUM r_ <br /> Notes: 1-Proposed vertical fenestration and skylight areas entered in ENV-SHGC must match proposed U 2-- �v <br /> fenestration areas in ENV-UA. <br /> 2-If Target Area Adjustment is required per ENV-UA,then target areas will be automatically <br /> adjusted in ENV-SHGC. Refer to Target Area Adjustments worksheet for this calculation. <br /> 3-Provide NFRC rated SHGC or default from Table C303.1.3(3)for fenestration assembly SHGC. <br /> 4-Fenestration that separates conditioned space from a non-conditioned or semi-conditioned <br /> space shall be included in this worksheet. <br /> Skylights Proposed SHGC Target SHGC <br /> Provide source of SHGC,page/plan#of assembly detail&ID SHGC x Area(A) =SHGC x A SHGC x Area(A)= SHGC x A <br /> ID:Sunoptics Triple Dome 0.35 128 45 0.35 4160 1456.0 <br /> ID:Smike Vents 0.37 4032 1492 SHGC 0.35 <br /> ID: <br /> ID: <br /> ID: <br /> Totals 4160.0 1536.6 Totals 4160.0 1456.0 <br /> All Non-North Vertical Fenestration+ Proposed SHGC Target SHGC++ <br /> Provide source of SHGC,page/plan#of assembly PF SHGC* x Area(A)=SHGC x A PF SHGC x Area(A)= SHGC x A <br /> detail&ID Category <br /> ID: 0 0.40 2545 1018 PF<0.2 0.40 2545 1018.0 <br /> ID: 0.50 0.48 515 247 0.25PF<0. 0.48 <br /> ID: 0 IPF 2 0.5 0.64 515 330 <br /> ID: 0 ++If projection factor(PF)credits are <br /> ID: 0 applied to the proposed design, Target <br /> ID: 0 SHGC will sum fenestration area by PF <br /> ID: 0 <br /> category. <br /> I' <br /> ID: 0 <br /> ID: 0 <br /> ID: 0 <br /> +If projection factor credit is applied, then vertical Totals 3060.0 1265.2 Totals 3060.0 1347.6 <br /> fenestration must be entered in the correct table according to <br /> orientation. If credit is not applied then all vertical <br /> fenestration can be entered in either table. <br /> *Note:Fenestration that separates conditioned space from a <br /> non-conditioned or semi-conditioned space shall be listed <br /> here with a proposed SHGC equal to the target value. <br /> North Vertical Fenestration+ Proposed SHGC Target SHGC++ <br /> Provide source of SHGC,page/plan#of assembly PF SHGC* x Area(A)=SHGC x A PF SHGC x Area(A)= SHGC x A <br /> detail&ID Category <br /> ID: 0 0.40 2005 B02PF<0.2 0.40 2005 1 802.0 <br /> ID: 1.00 0.40 84 34IPF <br /> 0.25PF<0. 0.44 <br /> ID: 0 2 0.5 0.48 84 40 <br /> ID: 0 ++If projection factor(PF)credits are applied <br /> ID: 0to the proposed design, Target SHGC will <br /> ID: 0 sum fenestration area by PF category. <br /> ID: 0 I <br /> North Total 2089.0 835.6 2089.0 842.3 <br /> Area SHGC x A Area JSHGCxAJ <br /> To comply,the Proposed total SHGC x A for all fenestration(vertical Grand Grand <br /> &skylights)shall not exceed the Target total SHGC x A. Total 9309.0 3637.4 Total 9309.0 3645.9 <br /> Component Performance Compliance (SHGC) SHGC COMPLIES <br />