My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6101 ASSOCIATED BLVD BASE FILE 2017-06-05
>
Address Records
>
ASSOCIATED BLVD
>
6101
>
BASE FILE
>
6101 ASSOCIATED BLVD BASE FILE 2017-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 1:50:29 PM
Creation date
5/15/2017 10:33:04 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6101
Tenant Name
BASE FILE
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
such a size and arrangement to accommodate a 24-inch by 84-inch ambulance stretcher in <br /> the horizontal,open position and shall be identified by the international symbol for <br /> emergency medical services(star of life). The symbol shall not be less than 3 inches high <br /> and shall be placed inside on both sides of the hoistway door frame. <br /> Exception: If all stories within the building have direct,accessible egress to grade (EMC <br /> 16.01,SectionV). <br /> 26. A building footprint and lot layout for this project shall be provided.to the Fire Marshal's <br /> Office on CD/DVD. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service orders, <br /> please contact Marilyn Davis Westlund at(425)356-7512 at least 90 days prior to the <br /> required in-service date. <br /> Any relocation of existing gas facilities for this development will be at the developer's sole <br /> expense,and requires 90 days minimum notice. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br /> development. However,the existing District facilities in the local area may require <br /> upgrading. Cost of any work,new or upgrade,to existing facilities that is required to <br /> connect this proposed development to the District electric system shall be in accordance <br /> with the applicable District policy. The development will be required to supply the District <br /> with suitable locations/easements upon their property for any underground electrical <br /> facilities that must be installed to serve the proposed development. Contact with the <br /> District is recommended prior to design of the proposed project. <br /> For information about specific electrical service requirements,please call the.District's <br /> Everett office at(425)783-8272 to contact a Customer Engineer. <br /> '� 21 0 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.