Underwood Gartland Everett, LLC ES-2232.02 <br /> February 6, 2015 Page 8 <br /> If the above slope gradients cannot be achieved, temporary shoring may be required. <br /> Permanent slopes should maintain a gradient of 2H:1 V, or flatter, and should be planted with an <br /> appropriate species of vegetation to enhance stability and to minimize erosion. <br /> Drainage <br /> Relatively shallow and perched zones of groundwater seepage were observed at-depth within <br /> the existing fill deposits. As such, the presence of groundwater seepage should be anticipated, <br /> especially in deeper site and utility trench excavations. Based on the soil and groundwater <br /> conditions observed at the test sites, temporary construction dewatering of excavations will may <br /> be necessary at some locations, depending on the time of year. In our opinion, a perimeter <br /> footing drain should be installed around the building foundations. Depending on the height of <br /> the building pads relative to finish exterior grades, elimination of the footing drain at some <br /> locations may be possible. However, the geotechnical engineer should be consulted prior to <br /> considering eliminating footing drains. A typical footing drain detail is provided as Plate 3 of this <br /> study. <br /> Utility Support and Trench Backfill <br /> In our opinion, the existing soils observed throughout the site are generally suitable for support <br /> of utilities. The geotechnical engineer should be onsite during utility trench excavation activities <br /> to confirm stability along the base of trench excavations. Organic or highly compressible soils <br /> encountered in the trench excavations should not be used for supporting utilities. Additionally, <br /> large rubble encountered along the base of trench excavations should be removed and <br /> replaced with structural fill, if necessary. Utility trench backfill should be placed and compacted <br /> to the specifications of structural fill provided in this report, or to the applicable city of utility <br /> district specifications. <br /> Pavement Sections <br /> The performance of site pavements is largely related to the condition of the underlying <br /> subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and <br /> unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in <br /> pavement areas should be compacted to the specifications detailed in the "Site Preparation and <br /> Earthwork" section of this report. It is possible that soft, wet, or otherwise unsuitable subgrade <br /> areas may still exist after base grading activities. Any areas containing unsuitable or yielding <br /> subgrade conditions will require remedial measures such as cement treatment, overexcavation <br /> and thicker crushed rock or structural fill sections prior to pavement. <br /> For relatively high volume, heavily loaded pavements subjected to moderate to high, loaded <br /> truck traffic, the following preliminary pavement sections can be considered: <br /> • Three inches of hot-mix asphalt (HMA) placed over six inches of crushed rock base <br /> (CRB), or; <br /> • Three inches of HMA placed over four and one half inches of asphalt treated base <br /> (ATB). <br /> Earth Solutions NW, LLC <br />