My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/07/25 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/07/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2017 10:54:10 AM
Creation date
5/15/2017 10:51:22 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 2 9 <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with Tetra Tech, Proposed Action Originating Department Utilities <br /> Inc to provide Engineering Consent Contact Person Peter Berger <br /> Consultation Services for the Action Phone Number 425-257-8858 <br /> Water Filtration Plant First Reading FOR AGENDA OF July 25,2012 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filtration Plant None Professional <br /> 6133 Lake Chaplain Services Agreement <br /> Road, Sultan WA <br /> Amount Budgeted $112,000 <br /> Expenditure Required $29,800 AccountNumber(s): 401-5-200-121-923-:410 <br /> Budget Remaining $82,200 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Public Works wants to contract with Tetra Tech,Inc.to conduct an engineering evaluation of the electrical <br /> panels in the Water Filtration Plant to mitigate potential electrical arc flash hazards. This includes verifying <br /> panel design and construction, listing recommended corrective actions for each electrical panel and draft <br /> design, specification and construction standards to ensure future compliance with electrical safety best <br /> practices. The cost for this service is $29,800. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with Tetra Tech,Inc to provide <br /> Engineering Consultation Services for the Water Filtration Plant in the amount of$29,800. <br /> 257 <br />
The URL can be used to link to this page
Your browser does not support the video tag.