Laserfiche WebLink
29 <br /> TASK 3—Recommendations <br /> For each equipment in the listing of submittal 2,provide a narrative recommendation of corrective actions.This will <br /> be a series of options and the corresponding recommended corrective action. The recommendations will include the <br /> procedures for approaching/working on equipment or de-energizing equipment so that the equipment is safe to work <br /> on. As the Water Filtration Plant is modified electrically,consideration will need to be given to updating the Arc <br /> Flash Study and/or labels in whole or in part. The City will need to re-evaluate the category risks and any equipment <br /> modified. A recommendation and description identifying the practicalities of when,where and how to update the <br /> risk categories,labels or Arc Flash Study itself;will be provided. This will include identification into design <br /> standards or specification so that the City will have available'a criteria to implement with each project. <br /> Recommendations will also include reference to regulations applicable to testing equipment to verify that it is de- <br /> energized,with a practical description on its use. The recommendations will be provided in a table format. <br /> Submittal Task 3—Narrative with recommendations <br /> 24 hours is estimated for Task 3. <br /> Task 4—Expenses Budget <br /> For reimbursable expenses a budget of$1,000. <br /> Deliverables <br /> The following documents are the deliverables and will be combined into one report for the project: <br /> 1. Task 1—Listing of Equipment Category 3 or higher. <br /> 2. Task 2—Descriptions of a Series of Corrective Actions Options <br /> 3. Task 3—Recommendations • <br /> Schedule ' <br /> The schedule will be as mutually agreed between Tetra Tech and the City of Everett. <br /> • <br /> Page 12 <br /> (Form Approved by City Attorney's Office November 1,2009) <br /> 269 <br />