My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/07/25 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/07/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2017 10:54:10 AM
Creation date
5/15/2017 10:51:22 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, J <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Award the bid for the 112th Briefing COUNCIL BILL# <br /> Street S.E. —Silver Lake Road Proposed Action Originating Department Public Works <br /> to SR 527 Project to Razz Consent Contact Person Ryan Sass,P.E. <br /> Construction,Inc. Action Phone Number 425-257-8942 <br /> First Reading FOR AGENDA OF 07/25/2012 <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> • <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> 112t St. S.E. —Silver Bid Summary <br /> Lake Road to SR 527 <br /> Amount Budgeted $ 3,175,995.44 <br /> Expenditure Required $ 3,175,995.44 Account Number(s): PW3256,UP3256 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Bids for the 112th Street S.E.—Silver Lake Road to SR 527 Project were opened on July 3,2012,with eight <br /> (8)bid proposals received for the construction project. Razz Construction,Inc., of Bellingham, WA, <br /> submitted the lowest responsive and responsible bid in the amount of$3,175,995.44. This project will <br /> construct improvements to the 112th Street S.E.—Silver Lake Road to SR 527 segment which include: <br /> widening the existing street to five lanes with curb, gutter, sidewalk,bicycle lanes, storm drainage facilities, <br /> illumination,water main, and traffic signal modifications. <br /> The funding sources for the construction contract are as follows: <br /> TIB Grant(State) $1,552,211.21 <br /> Fund 157 -Traffic Mitigation 1,034,808.14 <br /> Fund 338—Utility Construction 588,976.09 <br /> Total $3,175,995.44 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Award the bid for the 112th Street S.E.—Silver Lake Road to SR 527 Project to Razz Construction,Inc. in <br /> the amount of$ 3,175,995.44, including Washington State Sales Tax. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.