Laserfiche WebLink
2 <br /> 14% and so on according to the Incentive Structure chart in table 2 below. <br /> See example listed below. <br /> Minimum Threshold Amount(in millions) <br /> 2013 2014 2015 2016 2017 <br /> 2.225 2.25 2.275 2.30 2.325 <br /> Table 1 <br /> Incentive Structure <br /> Cate Incentive 201309 20140 20151- 20162 2017 <br /> gory % <br /> Gross Gross Gross Gross Gross Profit <br /> Profit in Profit in Profit in Profit in in millions <br /> millions millions millions millions <br /> 1 10 2.225- 2.25- 2.275- 2.30- 2.325-2.375 <br /> 2.275910 2.302.10 2.3252.15 2.352.20 <br /> 5 2.15 2.20 2.25 240 <br /> 2 12 2.275- 2.30- 2.325- 2.35- 2.375-2.425 <br /> 2.3252.15 2.35120 2.3752.25 2.402.30 <br /> 2.250 _ 2.35 2:40 <br /> 3 14 2.325- 2.35- 2.375- 2.40- 2.425-2.475 <br /> 2.3752.25 2.40273-0 2.4252.35 2.452.40 <br /> 2.35 2.40 2.45 2-50 <br /> 4 16 2.375- 2.40- 2.425- 2.45- 2.475-2.525 <br /> 2.425- 2.452.40 2.4752.45 2.502.50 <br /> 2.6492.35 ---2,50 2.55 2:60 <br /> 2.45 <br /> 5 18 2.425- 2.45- 2.475- 2.50- 2.525-2.575 <br /> 2.4752745 2.502.50 2.5252.55 2.552.60 <br /> 2.55 2.60 2.65 2-70 <br /> 6 20 2.475+2.5 2.50+2.6 2.525+2.6 2.55+2.70 2.575+ <br /> 5 + 0-+ <br /> Table 2 <br /> Contractor will not receive an incentive payment. It will only receive its <br /> merchandise and food/beverage cost of goods sold), <br /> e. Incentive payments are made by the end of the first quarter for the <br /> preceding calendar year, subsequent to the financial closeout and <br /> verification of the prior year's performance. <br /> e-f. For the year 2013 tThe minimum threshold for gross operating profit to <br /> earn an incentive payment is 2.225 million($1225,000.00) and rises <br /> 10 <br /> 17 <br />