Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 1 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with Jacobs Consent Contact Person David Voigt <br /> Engineering Group Inc. for Action Phone Number 425-257-8983 <br /> "Sewer System Replacement First Reading FOR AGENDA OF Aug 8, 2012 <br /> and Capacity Improvements Second Reading <br /> "M"Project" Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> NW Everett Oct 5,2011 PSA Exhibits for Scope Legal <br /> of Work and Budget <br /> Amount Budgeted $1,000,000 <br /> Expenditure Required $859,633 Account Number(s):UP 3470-1 <br /> Budget Remaining $140,367 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Jacobs Engineering Group Inc. has finished the preliminary engineering work that identifies the <br /> recommended method to eliminate basement flooding problems in the vicinity of Colby,Hoyt and 15th St.,to <br /> reduce combined sewer overflows to Port Gardner, wet weather flows to the WPCF and to replace a large <br /> number of existing sewer mains, manholes, storm drain structures and side sewers, many of which are over <br /> 100 years old. <br /> Amendment No. 1 is for preparation of plans, specifications, cost estimates and construction support <br /> services. <br /> Detailed design will occur during 2012 and early 2013. Construction is anticipated to begin in 2013 and be <br /> finished in early 2014. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with Jacobs <br /> Engineering Group Inc. for the"Sewer System Replacement and Capacity Improvements "M"Project"in the <br /> amount of$859,633. <br /> 9 <br />