Laserfiche WebLink
BOEING 40-25 FSi PROJECT NO: 1 1013.280 <br /> KEY ISSUES MEDIA ROOM BOEING PROJECT NO: 3356638 <br /> EVERETT, WASHINGTON PERMIT SET <br /> DIVISION 22 — PLUMBING <br /> 22 05 00 Common Work Results for Plumbing <br /> 22 07 00 Plumbing Insulation <br /> 22 10 00 Plumbing Piping and Pumps <br /> DIVISION 23 — HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) <br /> 23 05 00 Common Work Results for HVAC <br /> 23 05 29 Hangers and Supports for HVAC Piping and Equipment <br /> 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment <br /> 23 05 53 Painting and Identification for HVAC Piping, Ducts and Equipment <br /> 23 05 93 Testing, Adjusting, and Balancing for HVAC <br /> 23 08 00 Commissioning of HVAC <br /> 23 30 00 HVAC Air Distribution <br /> 23 34 00 HVAC Fans <br /> 23 40 00 HVAC Air Cleaning Devices <br /> 23 80 00 Decentralized HVAC Equipment <br /> DIVISION 26— ELECTRICAL <br /> 26 05 00 Basic Materials and Methods <br /> 26 05 11 Demolition of Electrical Components ' <br /> 26 05 19 Low Voltage Electrical Power Conductors and Cables <br /> 26 05 26 Grounding and Bonding for Electrical Systems <br /> 26 05 29 Hangars and Supports for Electrical Systems <br /> 26 05 33 Raceway and Boxes for Electrical Supports <br /> 26 09 23 Lighting Control Devices <br /> 26 27 16 Electrical Cabinets and Enclosures <br /> 26 28 16 Enclosed Switches and Circuit Breakers <br /> 26 51 00 Interior Lighting <br /> Architectural Specifications 0241 19 <br /> 028313 <br /> 06 10 53 <br /> 06 20 23 <br /> 0721 00 <br /> 07 92 00 <br /> 0811 13 <br /> 081424 <br /> 0841 13 <br /> 0871 00 <br /> 0881 00 <br /> 09 22 16 <br /> 09 29 00 <br /> 0951 13 <br /> Table of Contents-ii <br />