Laserfiche WebLink
BOEING 40-25 FSi PROJECT NO: 11013.280 <br /> KEY ISSUES MEDIA ROOM DLR GROUP PROJECT NO: 73-15114-00 <br /> EVERETT,WASHINGTON PERMIT SET <br /> SECTION 024119 - SELECTIVE DEMOLITION <br /> PART 1 - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Division 01 Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section Includes: <br /> 1. Demolition and removal of selected portions of building or structure. <br /> 2. Salvage of existing items to be reused or recycled. <br /> B. Related Requirements: NOT USED <br /> 1.3 DEFINITIONS <br /> A. Remove: Detach items from existing construction and legally dispose of them off-site unless <br /> indicated to be removed and salvaged or removed and reinstalled. <br /> B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent <br /> damage, and deliver to Owner. <br /> C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall <br /> where indicated. <br /> D. Existing to Remain: Existing items of construction that are not to be permanently removed and <br /> that are not otherwise indicated to be removed, removed and salvaged, or removed and <br /> reinstalled. <br /> 1.4 MATERIALS OWNERSHIP <br /> A. Unless otherwise indicated, demolition waste becomes property of Contractor. <br /> B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones <br /> and their contents, commemorative plaques and tablets, and other items of interest or value to <br /> Owner that may be uncovered during demolition remain the property of Owner. <br /> 1. Carefully salvage in a manner to prevent damage and promptly return to Owner. <br /> SELECTIVE DEMOLITION 024119- 1 <br />