Laserfiche WebLink
INSPECTION REPORT <br /> Date > > I?j�101p Permit.-C) <br /> Contractor: e �a� C'7 r�V <br /> Owner: -;;bof� <br /> Site Address:-�)(Y� J __ w ccC�\r-O T <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceilin Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Fi al ❑Shear Nailing GAS PIPE <br /> ITE WO ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Foo Ing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PEFUNN <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> v <br /> Inspector:_ _ Date: <br /> EIR(10/06) jTT� D,TABAR,INC. <br />