Laserfiche WebLink
I <br /> INSPECTION REPORT <br /> Date 1 is Permit: C H � r© c <br /> Contractor: a W� <br /> Pdress: <br /> Owner:Site A -Iy� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUIL G MECHANICAL PLUMBING <br /> F-1TempService [ FER ground F-1Groundwork/Slab ❑Groundwork/Slab <br /> F1 Groundwork Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Buildiineng Final �]❑Gas Pipe Final E]HWT Final <br /> OTHER OR CONSULTATION: _�1 _ `�� C-� 0 <br /> APPROVAL PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> PERFORM INSPECTION: _ <br /> (425)2 - 1 FOR REINSPECTION—24 hour notice required <br /> Inspector: ` Date: �'� / e / <br /> E I R(10/06) DATABAR,INC. <br />