Laserfiche WebLink
k <br /> / ,�d o oan000 <br /> / 1 u ouo <br /> \ euxw+c co"e,ur3vrtwc. <br /> 1A <br /> 38 <br /> 1A sad iea,ssws.am <br /> U aas.5. w"t,gs ams <br /> � td n..seo° <br /> -- - 3A _ au.nsee, <br /> � 4 <br /> 1A 2 3A <br /> 113 <br /> i <br /> 2 <br /> 1A.ENSURE SHEATHING IS FLUSH WITH FRAMING 2.INSTALL BASE FLASHING SET IN BEAD OF SEALANT 3A.APPLY SAF TO JAMBS(LAP SILL PAN) <br /> 1 B.INSTALL SILL PAN IN BEAD OF SEALANT 3B.APPLY SAF TO HEAD(EXTEND 1"PAST JAMB) \ <br /> 4. APPLY CONT BEAD OF SEALANT TO THE BACK OF THE <br /> SILL PAN,HEAD&JAMB FLANGES. ALIGN SEALANT WITH <br /> PRE-PUNCHED HOLES.HANG LEVEUSQ/PLUMB <br /> WCORROSION RESISTANT FASTENERS,PER <br /> MANUFACTURERS INSTRUCTIONS.ENSURE PROPER <br /> OPERATION AFTER INSTALLATION <br /> /tt 7B <br /> 7A <br /> BA <br /> —BB '7C <br /> SA— <br /> Loo <br /> �-- <br /> 5A.APPLY SAF OVER JAMBS EXTEND 8 1/2"ABOVE RIO 6A.APPLY SEALANT TO HEAD+JAMB FLANGES 7A.SET HEAD FLASH'G IN SEALANT BEAD MAR 4. 6 2015 k Resurfacing <br /> Naukka Candominiu <br /> 2818 Grand Ave <br /> 5B.APPLY SAF AT HEAD EXTEND 1"BEYOND SAF AT JAMBS 6B.APPLY WRB LAP EA COURSE 50%USE ONLY 7B.LAP 818 LAYER OF WRB OVER HEAD FLASHING,SLIPEverett,WA 98201 <br /> cr.v <br /> ENOUGH STAPLES TO HOLD WRB IN PLACE WRB UNDER THE NEXT LAP ABOVE crkY'T'WF' t' <br /> , � r �. <br /> 7C.INSTALL FINISH SIDING PER SPEC'S t'ern.;L t c, acc; Deck it wfacing Deta. <br /> _ SLIDING GLASS DOOR INSTALLATION SEQUENCE DIAGRAM <br /> SCALE;114"=1'-0" �50-3— 1!7 0 5_° SK9 <br />