Laserfiche WebLink
600 University Street,Suite 610 <br /> ,", <br /> Seattle,WA 98101 <br /> m o f f a t t & n i c h o l (206)622-0222 <br /> ww ri.m offattn i ch ol.c om <br /> MEMORANDUM <br /> To: Elise Gronewald/Port of Everett <br /> From: Pooja Jain, PE, SEI Moffatt& Nichol <br /> Date: July 5, 2016 <br /> Subject: Port of Everett ESY Bulkhead General Conformance Memorandum <br /> M&N Job No.: 8057-04 <br /> This memorandum outlines the construction observation conducted by Moffatt&Nichol(M&N)during construction of <br /> Segments A and B of the ESY Bulkhead Project. In accordance with M&N's scope of services, M&N conducted <br /> periodic site visits and construction observation during the construction phase of the project. Such visits and <br /> observation were not intended to be an exhaustive check or a detailed inspection of the contractor's work. However, <br /> observed deficiencies were brought to the Client's attention verbally and/or via site visit memorandums. Based on <br /> M&N's observation, and to the best of M&N's knowledge, information,and belief,the work was performed in general <br /> conformance with the contract documents.The assessment of general conformance does not apply to project <br /> elements observed by others. <br /> Items Observed During Construction <br /> During construction M&N personnel performed site visits to perform general observation of construction Site visits <br /> were scheduled to coincide with weekly construction meeting and milestones of construction. Corrective measures <br /> observed during the site visits were documented in the form of site visit memorandums and submitted to the Port. <br /> Table 1 documents presents a summary of the project elements observed and date of observations.The detailed site <br /> visit reports reports are included in Appendix A. <br /> Table 1:Site Visit Observations <br /> Project Elements Observed Date Observed <br /> Sheet piles after installation, and excavation of existing deadman 10/10/2014 <br /> Sheet pile cutoff,sheet pile return walls, and excavation for new deadman and water line 10/28/2014 <br /> Waler installation, new deadman(after casting and form removal),temporary bracing,and new 11/26/2014 <br /> tiebacks <br /> Marine and bulkhead backfilling,waler installation, and deadman forming 2/11/2015 <br /> Deadman construction, backfilling,and tieback anchorage installation 2/17/2015 <br /> 2/24/2015 <br /> 3/2/2015 <br /> Tieback anchor grease cap installation 3/3/2015 <br /> 3/9/2014 <br /> Tieback damage repair 3/3/2015 <br /> 3/24/2015 <br /> 3/26/2015 <br /> Pile cap rebar and formwork 4/2/2015 <br /> 4/8/2015 <br /> 4/14/2015 <br /> 4/21/2015 <br /> Begein4444. 4444 <br />