Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> i <br /> a <br /> `• QTR j�ia.T K A'��9,Y"'a° fG <br /> Figure 5: Waterline and Excavation for the New Deadman <br /> Figure 5 shows the excavation along the Segment A existing deadman.The excavated soil that was <br /> stockpiled between the deadman and the existing bulkhead has been removed.Visible in the photo are <br /> a number of timber piles behind the existing concrete deadman.The waterline has been placed in the <br /> excavation and disinfected.The waterline tie-in is scheduled for the end of the week. <br /> '/,1 6 <br />