Laserfiche WebLink
Project File M&N#:8057-03 <br /> 26 November 2014 Site Visit Memorandum <br /> Will <br /> Figure 3:Steel Waler Partially Installed Along Segment B <br /> The steel waler had been installed for the southern portion of Segment B, while crews were working on <br /> installing the waler along the 14th Street portion of Segment A.The waler support brackets were <br /> installed along the entire length of the new bulkhead.The support brackets and installed portion of the <br /> waler can be seen in Figure 3. The new waler appears to be installed in a level position. <br /> 'I1' 3 <br />