Laserfiche WebLink
Project File M&N#:8057-03 <br /> 18 February 2015 Site Visit Memorandum <br /> <s <br /> 'MiAmw <br /> f <br /> Figure 6:Segment B Deadman <br /> Figure 6 shows the progress of the deadman construction along Segment B.The bottom portion of the <br /> steel forms are in place for most of the length of the deadman. The temporary H-Piles that were used to <br /> support the sheet piles during dredging operations are still in place behind the deadman formwork. All <br /> of the tiebacks are in place along segment B.The photo was taken around high tide which causes the <br /> excavation for the new deadman to flood. <br /> "„ 7 <br />