Laserfiche WebLink
Project File M&N#:8057-03 <br /> 26 February 2015 Site Visit Memorandum <br /> 1 <br /> - •. -tom i <br /> aD. <br /> t y ti.Y <br /> k. <br /> Figure 2: New Concrete Deadman Along Segment B <br /> Figure 2 shows the current progress of the concrete deadman along Segment B.At this point the entire <br /> deadman has been cast.The southernmost portion of the deadman appears to be recently poured and <br /> is being cured. The temporary H-piles are still in place along the length of Segment B. <br /> ,,,lq 3 <br />