Laserfiche WebLink
600 University Street,Suite 610 <br /> hi,hi' Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> m o f f a t t & n i c h o I www.moffatinicnol com <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE(M&N) <br /> Date: 2 March 2015 <br /> Subject: Port of Everett ESY Bulkhead Site Visit <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 2 March 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Observe current progress. <br /> Time: 9:30 am—10:45 am <br /> Weather: Sunny <br /> Personnel in Attendance: <br /> Stuart Stringer(Moffatt& Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol met with Elise Gronewald from the Port of Everett to observe the <br /> Contractor installing the grease filled caps at the deadman end of the tiebacks along Segment B and the <br /> southern portion of Segment A. None of the buried tiebacks along Segment A(141h street or the diagonal <br /> portion of the wall) had been exposed at the time of the site visit. <br /> By the time we arrived onsite the Contractor had already cleaned the rust off of the tieback rods and <br /> nuts with a wire wheel, and installed the grease behind the nuts. Figure 1 shows the cleaned and <br /> greased tieback anchor.There was no evidence of heavy corrosion or pitting of either the nut or the <br /> tierod. <br />