Project File M&N#:8057-03 <br /> 2 March 2015 Site Visit Memorandum <br /> 1_ z <br /> Figure 2: Plastic Grease Filled Cap <br /> The contractor then installed the plastic grease filled caps, as shown in Figure 2.The caps were hand <br /> filled with grease then pushed over the tie rod and nut. Excess grease was pushed out of a port in the <br /> plastic cap and out of the gap between the cap and the bearing pad. The bolts were then installed to <br /> secure the plastic cap to the bearing plate. It appears the caps were completely filled with grease and <br /> installed correctly. <br /> Figure 3 shows one of several bearing plates that were not flush with the back face of the concrete <br /> deadman. As can be seen in the photo there is some dirt between the plate and the deadman.This was <br /> pointed out to the Contractor who said they would clean out the dirt before the tierods were tightened. <br /> „" 3 <br />