Laserfiche WebLink
600 University Street,Suite 610 <br /> "„ Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> mottatt & nichoi <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 3 March 2015 <br /> Subject: Port of Everett ESY Bulkhead Site Visit <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 3 March 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Observe current progress. <br /> Time: 12:30pm—1:45pm <br /> Weather: Sunny <br /> Personnel in Attendance: <br /> Stuart Stringer(Moffatt& Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Dave Pischer(Landau) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol met with Elise Gronewald from the Port of Everett and Dave <br /> Pischer form Landau to observe the progress of construction.The primary focus of construction was the <br /> CSO line along the 14'street alignment,the tieback anchors along Segment B, and removing the <br /> temporary H-Piles along Segment B. Figures 1 and 2 show overall view of the site looking south along <br /> the Segment B deadman, and the looking east along the CSO line excavation respectively. <br />