Laserfiche WebLink
Project File M&N#:8057-03 <br /> 3 March 2015 Site Visit Memorandum <br /> r � eY4 <br /> �pV .. <br /> .. �� ? <br /> r r.• v � � �r t <br /> Figure 3:Tieback Anchor Plate Reinstallation <br /> Due to the uneven bearing of the tierod anchor plates noted in the field inspection by Moffatt & Nichol <br /> on 2 March 2105 the Contractor worked on smoothing the surface of the concrete.This was done by <br /> removing the plastic caps,grease, and tie rod nuts,then pulling the plate away from the concrete <br /> deadman. The concrete surface was then ground smooth to provide uniform bearing of the anchor <br /> plate.The plate, grease, nut, and plastic caps were then reinstalled. <br /> ,/„ 3 <br />