Laserfiche WebLink
600 University Street,Suite 610 <br /> "„ Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> m o f t a t t & n i c h o l www.moffattnichol.com <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 2 April 2015 <br /> Subject: Port of Everett ESY Bulkhead Pile Cap Rebar Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 2 April 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Inspection of the Pile Cap Rebar and Observe Progress of Construction <br /> Time: 10:00am—11:00pm <br /> Weather: Cloudy <br /> Personnel in Attendance: <br /> Stuart Stringer(Moffatt& Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol met with Elise Gronewald from the Port of Everett at approx. <br /> 10:00am to inspect the pile cap rebar for the second concrete pour. Concrete pour 2 will consist of the <br /> lower cap pour between the end of the viewing platform seat and WP4. The shaded area in Figure 1 <br /> shows the extent of the pour. <br /> Overall the rebar appeared to be in conformance with the contract documents. Figures 2 through 4 <br /> show the rebar cages and forms in place. <br />