My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 University Street,Suite 610 <br /> "'Iq Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> m o f f o t t & n i c h o l WW W.moi-iattnichol cum <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE(M&N) <br /> Date: 21 April 2015 <br /> Subject: Port of Everett ESY Bulkhead Pile Cap Rebar Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 21 April 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Observe Progress of Construction & Check Pile Cap Rebar <br /> Time: 11:00am—12:00pm <br /> Weather: Cloudy <br /> Personnel in Attendance: <br /> Stuart Stringer (Moffatt& Nichol) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol arrived onsite at approx. 11:00am to look at the pile cap rebar for <br /> the fifth and final pile cap concrete pour.This pour will consist of the Segment B curb between WP3 and <br /> WP4.The extent of the pour is shown in Figure 1. <br /> At the time of the site visit the Contractor was mostly complete with the rebar installation, and <br /> formwork setup. All of the rebar appeared to be placed in accordance with the contract documents. The <br /> only remaining items were for the Contractor to clean the rebar of concrete splatter(from the previous <br /> concrete pour) and remove debris from the formwork. Figures 2 through 4 show the progress of the pile <br /> cap construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.