Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> a <br /> D , <br /> — <br /> ',s,..Br <br /> w, t' <br /> w A@ <br /> .r' r <br /> 8 l� <br /> lr <br /> 11 =m. Y <br /> Figure 6: Broken Existing Tieback Anchor <br /> When Magnus Pacific excavated in front of the existing deadman it was found that a number of the <br /> existing tiebacks were broken at the connection to the deadman. It does not appear this was a result of <br /> the Contractors excavation. Figure 6 shows several of the broken tiebacks. <br /> h/lh® 7 <br />