My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHANNON&WILSON,INC. <br /> 5.6 Plans Review and Construction Observation <br /> We recommend that Shannon & Wilson, Inc. be retained to review those portions of the plans <br /> and specifications that pertain to the bulkhead, foundations, and earthwork to determine if they <br /> are consistent with our recommendations. We recommend that we be retained to observe the <br /> geotechnical aspects of construction, particularly the pile installation for the bulkhead, viewing <br /> platform, and temporary support areas, and the installation of the deadman anchor and associated <br /> soil compaction to check that the work is accomplished in accordance with the plans and <br /> specifications and our recommendations. <br /> 6.0 LIMITATIONS <br /> The analyses, conclusions, and recommendations contained in this report are based upon site <br /> conditions as they presently exist, and further assume that the explorations are representative of <br /> the subsurface conditions along the bulkhead and viewing platform. The primary assumption is <br /> that the subsurface conditions everywhere are not significantly different from those disclosed by <br /> the explorations. Within the limitations of the scope, schedule, and budget,the analyses, <br /> conclusions, and recommendations presented in this report were prepared in accordance with <br /> generally accepted professional geotechnical engineering principles and practice in this area at <br /> the time this report was prepared. We make no other warranty, either express or implied. Our <br /> conclusions and recommendations were based on our understanding of the project as described <br /> in this report and the site conditions as interpreted from the explorations. <br /> If, during construction, subsurface conditions different from those encountered in the field <br /> explorations are observed or appear to be present during excavations and pile installation, we <br /> should be advised at once so that we can review these conditions and reconsider our <br /> recommendations where necessary. If there is substantial lapse of time between the submission <br /> of this report and the start of work at the site, or if conditions have changed due to natural causes <br /> or construction operations at or adjacent to the site, we recommend that we review our report for <br /> the applicability of our recommendations considering the changed conditions and time lapse. <br /> This report was prepared for the exclusive use of the Port and MNE. It should be made available <br /> to prospective contractors and/or the Contractor for information on factual data only, and not as a <br /> warranty of subsurface conditions such as those interpreted from the subsurface profile and <br /> presented in the discussion of subsurface conditions. <br /> 21-1-21761-003-R i r.aocx/W Picq, 21-1-21761-003 <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.