My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 80TH ST SW BASE FILE 2018-09-18
>
Address Records
>
80TH ST SW
>
1118
>
BASE FILE
>
1118 80TH ST SW BASE FILE 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 9:53:14 AM
Creation date
5/17/2017 11:03:18 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1118
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - __.:_._ ._ _ _ __ _, _ :_ . - <br /> � _ __ - _ _ <br /> � <br /> � <br /> Date: September 29,2017 � <br /> Katie Stana Tower Engineering Professionals <br /> Crown Castle 326 Tryon Road <br /> 2055 S.Stearman Drive Raleigh, NC 27603 <br /> Chandler,AZ 85286 (919)661-6351 <br /> (602)845-1747 crownCcr�teparoup.net <br /> Subject: Structural Analysis Report <br /> Carrier Designation: AT&T Mobility CaLocate <br /> Carrier Site Number: SN05 <br /> Carrier Site Name: Paine Field <br /> Crown Casfle Designation: Crown Castle BU Number: 856390 <br /> Crown Castle Site Name: Paine Field <br /> Crown Castle JDE Job Number: 460751 <br /> Crawn Castle Work Order Number: 1464887 <br /> Crown Castle Application Number: 405807 Rev. 6 <br /> Engineering Firm Designafion: TEP Project Number: 62974.134464 <br /> Site Data: 1118 8Qth Street Sauthwest,Everett, <br /> Snohomish County,WA 9820.i <br /> Latitude 47°55'28.99;Longitude-122�15'1.98" <br /> 100 Foot-Self Supporting Tower <br /> Dear Katie Stana, <br /> Tower Engineering Professionals is pleased to submit this "Structural Analysis Repart" to determine the structural <br /> integrity of the above mentioned tower. This analysis has been performed in accordance with the Crown Castle <br /> Structural `Statement of Work' and the terms of Crown Castle Purchase Order Number 1086402, in accordance with <br /> application 405807, revision 6. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have <br /> determined the tower stress level for the structure and foundation, under the following load case,to be: <br /> LC5: Existing+Proposed Equipment Sufficient Capacity <br /> Note:See Table I and Table II for the proposed and existing loading,respectively. <br /> The analysis has been performed in accordance with the 2015 International Building Code based upon an ultimate <br /> 3-second gust wind speed of 110 mph converted to a nominal 3-second gust wind speed of 85 mph per section <br /> 1609.3.1 as required for use in the TIA-222-G Standard per Exception#5 of Section 1609.1.1. Exposure category <br /> C and Risk Category II were used in this analysis. <br /> All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances listed <br /> in Tables 1 and 2 and the attached drawing for the determined available structural capaciry to be effective. <br /> We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional services to <br /> you and Crown Castle. If you have any questions or need further assistance on this or any other projects please give <br /> us a calL <br /> Structural analysis prepared by: Ihar V.Viarenich, E.I./MKL �. 3 � <br /> OF � . <br /> Respectfully submitted by: �' '�'c� <br /> , z <br /> � <br /> Ryan J. Rimmele, P.E.,S.E. '�p�� �j 02� �ww�,�W <br /> � �RAL�NG` '�� <br /> �`SI�NAL F'�� ��2���1 <br /> r���=�r��,���,�i.,;�,�;: <br />
The URL can be used to link to this page
Your browser does not support the video tag.