Laserfiche WebLink
C(ID C--) 7--C)2-V- <br /> S' <br /> Date: February 3,2016 <br /> Talissa Huntsman Tower Engineering Professionals <br /> Crown Castle 326 Tryon Road <br /> 2055 S. Stearman Drive Raleigh, NC 27603 <br /> Chandler, AZ 85286 (919) 661-6351 <br /> (602) 845-1719 crown0teparoup.net <br /> Subject: Structural Analysis Report <br /> Carrier Designation: AT&T Mobility Co-Locate <br /> Carrier Site Number: 10098233 <br /> Carrier Site Name: Paine Field <br /> Crown Castle Designation: Crown Castle BU Number: 856390 <br /> Crown Castle Site Name: Paine Field <br /> Crown Castle JDE Job Number: 360268 <br /> Crown Castle Work Order Number: 1175277 <br /> Crown Castle Application Number: 322242 Rev. 4 <br /> Engineering Firm Designation: TEP Project Number: 62974.42575 <br /> Site Data: 1118 80th Street Southwest, Everett, Snohomish County,WA 98203 <br /> Latitude 47055'28.99'; Longitude -122°15'1.98" <br /> 100 Foot-Self Support Tower <br /> Dear Talissa Huntsman, <br /> Tower Engineering Professionals is pleased to submit this "Structural Analysis Report" to determine the <br /> structural integrity of the above mentioned tower. This analysis has been performed in accordance with the Crown <br /> Castle Structural 'Statement: of Work' and the terms of Crown Castle Purchase Order Number 868374, in <br /> accordance with application 322242, revision 4. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have <br /> determined the tower stress level for the structure and foundation, under the following load case, to be: <br /> LC5: Existing + Proposed Equipment Sufficient Capacity <br /> Note:See Table I and Table II for the proposed and existing loading,respectively. <br /> The analysis has been performed in accordance with the 2012 Washington Building Code, WAC Chapter 51-50 <br /> (2012 International Building Code) based upon an ultimate 3-second gust wind speed of 110 mph converted to a <br /> nominal 3-second gust wind speed of 85 mph per Section 1609.3.1 as required for use in the TIA-222-G Standard <br /> per Exception #5 of Section 1609.1.1. Exposure Category C and Risk Category II were used in this analysis. <br /> All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances <br /> listed in Tables 1 and 2 and the attached drawing for the determined available structural capacity to be effective. <br /> We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional <br /> services to you and Crown Castle. If you have any questions or need further assistance on this or any other <br /> projects please give us a call. <br /> Structural analysis prepared by: Jay W. Balk/MZS F ' <br /> wasy�'�') <br /> o <br /> Respectfully submitted by: 2 <br /> e o <br /> lit <br /> William H. Martin, P.E., S.E. G 48518�G��'�'�, <br /> L E �� <br /> �sS/ONAI, <br />