Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION <br /> LUMP SUM <br /> The City shall pay Service Provider Thirteen Thousand Three Hundred Twenty Four dollars($13,324.00) <br /> upon completion of the work, subject to the maximum stated in¶4(D)of this Agreement. <br /> A breakdown of the compensation is as follows: <br /> LUMP SUM COMPENSATION <br /> Phase 1 Geological Engineering Services: $11,069.00 <br /> Laboratory Testing: $ 655.00 <br /> Private Utilities Locator: $ 400.00 <br /> Subtotal: $12,124.00 <br /> DESIGN CONTINGENCY FEE(IF REQUIRED) <br /> Additional Services that may be needed based upon any issues that surface during the geological services of the <br /> project as approved only in writing and signed by an authorized City representative: <br /> TOTAL CONTINGENCY FEE $ 1.200.00 <br /> TOTAL FEE $13,324.00 <br />