Laserfiche WebLink
4.2.6 Issue the District a right-of-way permit within six (6) weeks after the District <br /> submitting a complete permit application (including any supporting <br /> documentation reasonably required by the City) and receiving notification that <br /> their application has been assigned a permit tracking number in the City's <br /> system. <br /> 4.2.7 Provide the District not less than two (2) working days' notice to inspect the <br /> conduits. <br /> 4.2.8 Whenever any utility pole(s) are required to be temporarily supported due to <br /> excavation in proximity to such poles, the City will coordinate with the <br /> District to provide such support a minimum of two (2) working days prior to <br /> the date of work. The scheduling of District labor for the pole holds will be <br /> limited to the District's regular business hours. <br /> 4.2.9 Provide the District with a bill of sale for all facilities installed by the City that <br /> will become part of the District's electrical system. The format for the bill of <br /> sale will be coordinated with the District and shall be submitted within ninety <br /> (90) calendar days of the District's acceptance of the completed installation as <br /> set forth in Subsection 5.2.4. <br /> 5. Underground Conversion Work District Responsibilities <br /> 5.1 Design Phase: <br /> 5.1.1 The District has produced underground drawing 13606 ("Joint Utility Trench <br /> Plan") which the City has elected to incorporate into their bid package. The <br /> District has coordinated its work on the Joint Utility Trench Plan with the <br /> Other Utilities in an effort to incorporate the conduit requirements of the <br /> Other Utilities in the Joint Utility Trench Plan; however, the City will <br /> coordinate a design review meeting with the District and Other Utilities prior <br /> to releasing the project for construction. The District may revise the Joint <br /> Utility Trench Plan by providing the revised version to the City no later the <br /> date the City calls for bids for construction of the Joint Utility Trench Plan. <br /> These revisions are subject to the approval of the City, which will not be <br /> unreasonably withheld. <br /> 5.1.2 Unless delayed for reasons stated in Subsection 5.2.9, the District shall <br /> complete the design for the conversion of the 12.47kV overhead utilities to an <br /> underground system within twenty (20) working days after execution of this <br /> Agreement. This design is for work to be completed by the District at the <br /> District's cost and is work not included in the Joint Utility Trench Plan. The <br /> District shall provide electronic fmal design plans and specifications to the <br /> City for reference use in bidding and construction. <br /> 5 <br />