6.2 Bridge Pole Notice. The City will provide a written notice to the District <br /> regarding the Bridge Poles (the "Bridge Pole Notice"), which must contain three elements as <br /> described below: <br /> Element One: Deadline for Raising of Bridge Poles. The Bridge Pole Notice <br /> must state the deadline date for the District's completion of the raising of the Bridge Poles to the <br /> height shown in Exhibit A. This deadline date shall be no sooner than ninety(90) days after date <br /> of delivery of the Bridge Pole Notice and no earlier than May 31, 2017. <br /> Element Two: De-Energize Period. The Parties acknowledge that the erection of <br /> the Bridge will require that the power lines between the Bridge Poles be de-energized for a <br /> period of time ("De-Energize Period"). Accordingly,the Bridge Pole Notice must also designate <br /> when the De-Energize Period is to occur. The City and District acknowledge that, unless <br /> mutually agreed otherwise in writing, the maximum duration of the De-Energize Period is two <br /> weeks, and such two weeks must occur between June 1, 2017 and August 31, 2017. After the <br /> Bridge Pole Notice, the City or its contractor may revise when the De-Energize Period is to <br /> occur, but such revision must be in writing delivered to the District and the District may reject <br /> such a revision at the District's sole discretion if such revision causes the De-Energize Period to <br /> occur earlier than as designated in the Bridge Pole Notice. <br /> Element Three: Contractor Election Regarding Bridge Pole Power Lines. The <br /> Bridge Pole Notice must also state whether the City's contractor has elected either(a)to erect the <br /> bridge during the De-Energize Period with the de-energized power lines between the Bridge <br /> Poles left in place or (b) to erect the bridge during the De-Energize Period with the de-energized <br /> power lines between the Bridge Poles removed. <br /> 6.3 Completion of High Line Work. Subject to Section 5.2.9 and Section 7, the <br /> District shall complete at the District's cost the High Line Work in accordance with the Bridge <br /> Pole Notice and Exhibit A. The District incorporated into its High Line Design as shown in <br /> Exhibit A, a new pole and a pole replacement that will facilitate construction, removal and <br /> reinstallation of the High Line outside of the Bridge Poles. The City acknowledges and agrees <br /> that, if the City's contractor elects to erect the bridge during the De-Energize Period with the de- <br /> energized power lines between the Bridge Poles removed,the District will utilize these two poles <br /> noted above as "new" and a"replacement". If this occurs, then the City may require the District <br /> after bridge erection to lower or remove the "new" pole and lower the "replacement" pole if the <br /> City pays for the costs of such effort. If the City elects not to pay such lowering costs, then the <br /> District may leave such poles as-is after bridge erection. <br /> 7. Excusable Delay. <br /> Excusable delay means a failure to perform in a timely manner due to events or causes <br /> that are not reasonably within the control or contemplation of the Party whose ability to perform <br /> is delayed by such events or causes. Without limitation, such events or causes may include: <br /> extreme or unusual weather, landslides, lightning, forest fires, storms, floods, freezing, drought, <br /> earthquakes, civil disturbances, strikes, or other disturbances associated with labor relations, acts <br /> of the public enemy, wars,public riots, breakage, explosion, accident to machinery or equipment <br /> (reasonably related to the delayed performance), reasonably unanticipated changed site <br /> conditions, the failure of any government entity with jurisdiction over the design phase and/or <br /> 8 <br />